hub picture

Computer Networks in Young Hall - West Wing


Infrastructure

West Wing of Young Hall is an older part of the building that is not scheduled to be renovated in the foreseeable future. In order to modernize the network infrastructure, a hub room has been set up on the third floor of the Wing and 5" conduits placed between the hub room and the remaining floors. On the order of a 100 Cat 5 UTP runs have been installed throughout the West Wing and punched down in the hub room.

About a dozen nodes in the Wing still rely on the older 10Base5 (yellow hose) Backbone that snakes throughout the West Wing and detours into Geology to connect Solid-State Science Laboratory.

The network electronics in this Wing consist of a single LANNET LET-36 hub that provides connections to approx. 50 Ethernet nodes and two Datability terminal servers providing 25 connections. In addition, there are eight 'intelligent' Asante hubs located around West Wing with connections to approx. 100 nodes. The brouter module in the LET-36 is used to connect the older (thicknet) part of the network to the rest of the departmental network.


Applications

West Wing houses Administrative and Faculty Offices, Graduate and Undergraduate Student Offices, and several Biochemistry and Physical Chemistry Reseach Laboratories.


List of Module Ports and connected Nodes (requires authorization)
Last Updated 2/96 // mk